∗ Location: Doha , Qatar
∗ Key Project Features:
000♦ Procurement Engineering
000♦ Equipment Supply
000♦ Installation Supervision
∗ Client: Tunneling Professional company
∗ Contractor: Tana Trading, Contracting and Technology
∗ Commencement:2019
∗ Status: Completed
Project description:
Excavation and installation of 3.4 km RC or HDPE pipe of sewage system for Doha, Qatar ordered by Tunneling Professional Co. to Tana Trading, Contracting and Technology company . MGET was Tana Trading, Contracting and Technology company Contractor to select and supply Micro tunneling system for ID 2400 with upsize kit 3000 with drive length 400 m
The machine is supplied from MTS Microtunneling system GmbH the German brand in this plant.
Highlights:
The most challengeable part of this plant was as following:
000♦ The drive length changed from 400 to 610 m and the calculation should be revised accordingly